Site
needs to
be
leveled
and 2ft.
longer
and
wider
than
building
and
normally
3-4
inches
of berm
limestone
or no .8
limestone
to be
used as
a base,
or solid
concrete
blocks,
prepared
by
customer
there.
Will be
extra
charge t
do
excess
leveling
by crew.
All
buildings
should
be
stained
or
painted
as soon
as
possible.
When
painting,
use good
quality
primer
first.
Building
permits
are
considered
the
customers
responsibility
where
they are
required.
Builders
must be
able to
get
truck
within
50 foot
of site
or a $1
a foot
carry
charge
will be
added.
There is
a charge
of $2.50
per mile
after 15
miles. |